<html xmlns="http://www.w3c.org/1999/xhtml" xml:lang="en" lang="en"><head><link rel="stylesheet" type="text/css" href="houseofyin.css"/></head><body>
<table width="100%" border="0"  cellpadding="0" cellspacing="0">
    <tr id="bannertr">
       <td id="bannertd" height="60" width="152" border="0" align="left" valign="top" background="images/bannerleft.gif" nowrap="true"><a href="index.jsp"><img border="0" src="images/bannerleft.gif" height="60" width="152"/></a></td>
       <td id="bannertd2" height="60" width="100%" border="0" align="center" valign="middle" background="images/bannermiddle.gif" nowrap="true"><h1 class="banner">Risk</h1></td>
       <td id="bannerlab" height="60" width="140" border="0" align="right" valign="top" background="images/bannerright.gif" nowrap="true"><img border="0" src="images/bannerright.gif" height="60" width="140"/></td> 
    </tr>
</table>  

<table border="0"><tr><td valign="top"><span xmlns="" class="title">Software Risk Assessment and Mitigation Procedure (RAMP)</span><br xmlns=""/><span xmlns="" class="source">DISA Software Reuse Initiative</span>,
       <span xmlns="" class="source">1995 </span><br/><span xmlns="" class="author">by U.S. Army Space and Strategic Defense Command: Software Engineering Division, Applied Expertise and Quality Research</span><p xmlns=""><span class="label">Abstract: </span><abstract>Department of Defense (DoD) software costs have grown substantially over the last thirty years and are 
expected to reach $42 billion in 1995. Moreover, DoD software-intensive systems have been subject to both 
schedule slippage and poor performance. The effective application of risk management and software reuse 
throughout the acquisition of a DoD system can be a major factor in containing software life cycle costs 
and in improving the performance and reliability of the system. This Technical Report documents the 
activities performed in the development of a prototype DoD procedure aimed at assisting in the management 
of risks, in particular risks associated with software reuse. The procedure is called the Software Risk 
Assessment and Mitigation Procedure (RAMP). This Technical Report documents the results of the Phase I 
and Phase II efforts the RAMP Project. The purpose of Phase I and Phase II of the RAMP Project was to 
demonstrate the viability and appropriateness of RAMP within the DoD.
</abstract></p></td><td valign="top"/></tr></table>
     
     <p align="center">
<table border="0" cellpadding="0" cellspacing="2" width="505">
    <tr><td align="center">
    
        <a href="index.jsp"><img src="images/off.gif" width="84" height="58" border="0" alt="Home"/></a>
    
    <br/><span class="menu">Home</span>
    </td><td align="center">
    
        <a href="background.jsp"><img src="images/off.gif" width="84" height="58" border="0" alt="Background"/></a>
    
    <br/><span class="menu">Background</span>
    </td><td align="center">
    
        <a href="publications.jsp"><img src="images/on.gif" width="84" height="58" border="0" alt="Publications"/></a>
    
    <br/><span class="menu">Publications</span>
    </td><td align="center">
    
        <a href="presentations.jsp"><img src="images/off.gif" width="84" height="58" border="0" alt="Presentations"/></a>
    
    <br/><span class="menu">Presentations</span>
    </td><td align="center">
    
        <a href="whimsey.jsp"><img src="images/off.gif" width="84" height="58" border="0" alt="Whimsey"/></a>
    
    <br/><span class="menu">Whimsey</span>
    </td><td align="center">
    
        <a href="wedding.jsp"><img src="images/off.gif" width="84" height="58" border="0" alt="Wedding"/></a>
    
    <br/><span class="menu">Wedding</span>
    </td><td align="center">
    
        <a href="search.jsp"><img src="images/off.gif" width="84" height="58" border="0" alt="Search"/></a>
    
    <br/><span class="menu">Search</span>
    </td>
    <br/><br/>
     </tr>
</table>
</p>
</body></html>